Request a quote
Request a quote

ELECTRICAL · CRITICAL POWER · DATA CENTERS · SINCE 2011

Critical power anddata centers, deliveredon time.

Full-service electrical contractor for critical power, data centers, industrial facilities, traffic signalization and water infrastructure, serving operators, municipalities and enterprises across the United States, Mexico, Colombia and Venezuela.

  • TRUSTED BY
  • Claro
  • Telefónica
  • Telcel
  • Digitel
  • Nokia Networks
  • Ericsson
  • Aviat
  • TRUSTED BY
  • Claro
  • Telefónica
  • Telcel
  • Digitel
  • Nokia Networks
  • Ericsson
  • Aviat

WHAT WE DO

Eight capabilities. One electrical contractor.

From a single service call to a heavy industrial installation, under one contract. Our own electrical crews in every country we serve, working to NFPA 70E and ISO 9001.

Capability 01Colocation · enterprise · carrier facilities

Data center build-out

Fit-out and expansion of data halls and technical rooms: server racks, structured cabling, power distribution, UPS integration and commissioning, delivered inside live facilities without unplanned interruptions.

Request a quote
WHAT YOU GET
  • Rack and containment installation
  • Structured cabling, certified
  • PDU and UPS integration
  • Commissioning and acceptance package

TRACK RECORD

Fifteen years keeping critical loads online.

Every number here is a facility accepted, a crew home safe or a deadline met. Nothing rounded up, and references available for any of it.

  1. 0+
    Projects completedAcross every service line
    DATA CENTERSPOWERELECTRICALTRAFFICWATERNETWORKS
  2. 0
    CountriesOwn field teams in each
    USMXCOVE
  3. 0
    Years in operationPower and infrastructure since day one
    2011 2026
  4. 0
    Lost-time incidentsAll sites, 2023
    STOP-WORK AUTHORITY
2011 FOUNDED
USELETCOL foundedElectrical and infrastructure contractor
2020
USData-center fit-out, Miami NAPData center · 3,200 sq ft
MXRural coverage, TelcelNetworks · 60 towers
2021
COBattery replacement, ClaroPower · 450 sites
COFiber backbone, TelefónicaNetworks · 500 km
2022
VECore modernization, DigitelNetworks · Open RAN pilot
MXMicrowave backhaulNetworks · 85 links
USLTE densificationNetworks · 200+ sites
2023
USData-center DC power, AustinPower · Tier-3 colocation
CO5G NR rollout, BogotáNetworks · 120 sites
2024–26 ONGOING
··Active programsReferences on request

SELECTED PROJECTS

Proof, not promises.

Three deployments that show the range: a live data-center power build, a colocation fit-out and a nationwide battery program.

All projects
Power distribution racks in a data center
POWERDATA CENTER2023
US

Data-center DC power, Austin

Rectifier system, lithium battery integration and power distribution for a live Tier-3 colocation facility, delivered without an unplanned interruption.

FacilityTier-3
ScopeRectifiers + Li backup
Incidents0
StatusAccepted
View case study
Colocation expansion
DATA CENTER
US
Miami NAP · 2020

Colocation fit-out, 3,200 sq ft

Structured cabling, server racks and UPS systems for a colocation expansion at a major network access point.

View case study
Battery strings
POWER
CO
Colombia · 2021 · 450 sites

Nationwide battery replacement, Claro

Legacy VRLA strings replaced with OPzV gel batteries across 450 live sites, improving backup reliability network-wide.

View case study

HOW WE WORK

The same five stages on every facility.

Whether it's one technical room or a 450-site battery program, the sequence doesn't change. That discipline is what keeps us on schedule and the load online.

  1. Site survey and load study

    Existing distribution, loads, redundancy and access verified before anyone is scheduled.

    Survey report · load study
  2. Engineering and design

    Single-line diagrams, method statements and bill of materials to code and manufacturer specification.

    Approved single-line diagram
  3. Procurement and staging

    Rectifiers, batteries, UPS and switchgear staged and kitted per site so crews arrive with everything they need.

    Equipment kits · delivery schedule
  4. Installation

    Certified electrical crews, lockout/tagout on every energy source and a photographic record of every step.

    Installation photo record
  5. Commissioning and acceptance

    Load and discharge tests, thermal inspection, hand-over documentation and 24/7 follow-up.

    Commissioning report · acceptance

Mobilization in 2–4 weeks from contract. 24–72 hours for critical infrastructure failures.

Plan a build with us

WHERE WE OPERATE

Our own crews in four countries.

Local electrical crews, one project office. The same standards, documentation and safety program in every facility.

  • USUnited StatesHeadquarters · Southeast and nationalData centers · Electrical · Traffic · Water
  • MXMexicoNational coveragePower systems · Networks
  • COColombiaBogotá and nationalBattery programs · Power · Fiber
  • VEVenezuelaCaracas and nationalCore power · Networks
2–4 wkMobilization after contract
24–72 hResponse for critical failures
Technician in full personal protective equipment
0lost-time incidents · 2023
100%certified technicians
40 htraining before field work

SAFETY

Zero incidents. No exceptions.

Energized equipment, arc-flash environments, battery rooms and live data halls are everyday conditions for our crews. Every technician is trained, certified and equipped for them, and independent audits confirm it.

Stop-work authority. Anyone on site, technician, supervisor or visitor, can halt a job if they see an unsafe condition, without consequences.
  • NFPA 70E
  • OSHA
  • ISO 45001
  • ISO 9001
  • ISO 14001
  • ANSI/TIA
Our safety program

PRODUCTS

Equipment we supply and install.

Critical power equipment first, then IT hardware and smart systems, sourced to specification and installed by the same electrical crews that build the facilities.

Full catalogue

CLIENTS

What operators and facility teams say about us.

References from carriers and facility operators are available on request. Below, two of the people we've worked with.

"The team provided reliable support during our telecom power system upgrades. Their experience with energy systems and infrastructure integration helped ensure stable operations for our network equipment."

Andrés Mora · Technical DirectorDemo Carrier S.A., ColombiaDEMO CARRIER

"They delivered the rectifier and battery build inside a live facility without a single unplanned interruption, and the commissioning documentation was the most complete we have received."

Laura Jiménez · Facilities ManagerDemo Colocation Operator, USADEMO OEM
Client references from Claro, Telefónica and others on request. Ask for one
ClaroTelefónicaTelcelDigitel

START A PROJECT

Tell us the load. We reply in one business day.

Send the facility or site type, the scope, the location and the timeline. A project engineer, not a sales queue, comes back with next steps or an estimate.

Request a quoteReply within one business day
No newsletters. We only use this to reply to you.

Request sent

A project engineer will reply within one business day. For anything urgent, call or WhatsApp +1 (512) 677-4338.